Taille des projets
• Contracting Authority: Ministries of Transport of The Gambia and Senegal
• PPP Model: Design–Build–Finance–Operate–Maintain (DBFOM)
• Estimated Investment: To be determined
• Revenue Streams: User fees
• Faster, safer movement of people and goods between the two capitals
• Boost to tourism, logistics, labor mobility and cross-border trade
• Catalyst for transit-oriented development and urban regeneration
• Strengthened bilateral institutional cooperation through a Joint Project Implementation Unit (JPIU)
Résumé rapide
• Dual-track electrified standard-gauge tramway, including bridges, culverts and grade separations • Passenger stations in The Gambia and Senegal, with intermodal connectivity • Border stations and customs integration facilities • Integration with Senegal’s TER extension and joint operational framework • Rolling stock depots, maintenance yards, control centers and signaling systems
Mise en place du projet
Informations sur le projet
Détails de la révocation
Objet lié
Innovation numérique et Fintech
Incitations et soutien à l'investissement
Informations sur la localisation
Description
Country: The Gambia
Lien optionnel vers la page concernée
- Passerelle stratégique vers l'Afrique de l'Ouest
- Access to The Gambia market
- Couverture régionale de la CEDEAO